Because when we estimate, we drift toward the best-case scenario. In one study, students said they would finish their theses in 33.9 days on average; the actual time was 55.5 days. Recalling similar past tasks and linking them to the estimate removed this optimistic bias.

Source verified: 2026-10-12

What did the study do, and what did it find?

In the first study by Buehler, Griffin, and Ross, published in 1994, 37 psychology students writing an honors thesis at the University of Waterloo were asked when they would finish it. The students gave both their best guess and when it would be done if everything went as badly as possible.

The average best guess was 33.9 days, and the actual time was 55.5 days. Only 29.7% of the students finished within their own predicted time. The average worst-case estimate was 48.6 days, and only 48.7% made even that date. In the fourth study of the same paper, the optimistic bias disappeared in the group that recalled similar past tasks and linked them to their estimate.

Limits of this result

  • Small sample; only students and thesis work.
  • 4 students who did not finish within the recording period were left out of the average; the real gap may be larger.
  • The best-case drift explanation is the authors' interpretation, not a measured number.

A small step to try today

  • Before you set a time for a task, check how many days a similar task took last time.
  • Adjust your estimate based on that past time and put it in your calendar that way.

A small step is hard to remember every day. SelfPatch picks daily tasks that fit the time you have and tracks your progress.

Source

Buehler R, Griffin D, Ross M. Exploring the planning fallacy: Why people underestimate their task completion times. J Pers Soc Psychol. 1994;67(3):366-381. Read the study